C O M M E R C I A L
As "Enthusiastic Modernists" we try and provide buildings with a high level of utility and an architectural metaphor to reflect the inner function and purpose of the building on the exterior. We pride ourselves on pragmatic, no nonsense design solutions, We don’t believe that good design has to cost a lot of money.
VENTANA MEDICAL PLAZA
TARZANA CALIFORNIA
112,000 Four-Story state of the art imaging center to support
Providence Tarzana Hospital, construction began October 2014.
DMV HOLLYWOOD (FORMOSA)
HOLLYWOOD CALIFORNIA
Designed at former firm with former design partner. Renovation of former Warner Brothers service garage, built in 1946. LEED Silver Certified.
SAN BERNARDINO IMAGING CENTER
SAN BERNARDINO CALIFORNIA
This very successful conversion of an existing Marie Callendar's restaurant into a state of the art imagining center.
CHADO TEA ROOM
HOLLYWOOD AND HIGHLAND
HOLLYWOOD CALIFORNIA
High Tea in Hollywood, Second Level, Hollywood and Highland Mall.
AMERICAN MARTYRS CATHOLIC SCHOOL
MANHATTAN BEACH CALIFORNIA
Built four new classrooms over four existing classrooms without touching the existing ones, piece of cake.
"KASAI" TEPPANYAKI RESTAURANT (COMPETITION)
LOS ANGELES CALIFORNIA
Submission for design competition for fast casual Teppanyaki restaurant for major restaurant chain (We got second) not built.
1545 WILCOX CREATIVE SPACES
HOLLYWOOD CALIFORNIA
Production company offices in Hollywood featuring the "Dinosaur Wall".
RED BULL CONFERENCE ROOM EXPANSION
SANTA MONICA CALIFORNIA
Additional conferencing was required and designed
but the city did not approve.
PIPER JAFFRAY FINANCE
BIJOU THEATER THIRD FLOOR
HERMOSA BEACH CALIFORNIA
Punched a hole in the ceiling, stuck our heads through the ceiling and
saw 55'-0" clear span bridge trusses that hadn't seen the light of day for 72 years.
We sandblasted them and they came right back to life.
BUILDING RENOVATION
GRAND AND RICHMOND STREETS
EL SEGUNDO CALIFORNIA
Took out the dropped ceiling and devised a new structural system by through bolting and placing structural rods to create a rigid triangle. We sandblasted the interior structure and reskinned the building with new brick facing.